NCS was engaged to rehabilitate Clarifier 2 at Mudgeeraba Water Treatment Plant, on the Gold Coast. The Mudgeeraba WTP, is one of the 5 largest WTP’s operated by SEQ Water.
Stage 1 included the relining of over 2000 square metres of concrete surfaces, that had deteriorated over time due to the nature of the asset. After consultation with the client, the specification for epoxy products for rehabilitation was changed to a more sustainable approach using crystalline technology and specialised polymer-modified mortars, able to withstand the varying water quality within the environment. All joints were rehabilitated with suitable sealants, thus ensuring a full rehabilitation of the Asset, and greatly reducing future maintenance costs for the asset owner. Our successful completion of stage 1, ensured we progressed to stage 2 some months later.