Projects

The tank had been exhibiting signs of corrosion in the top 500 mm of the internal wall and along the…
Following a competitive tender process, NCS were selected to rehabilitate, waterproof and stabilise a 1.2 km stretch of a concrete…
The prime contractor was seeking an experienced contractor to strengthen a post-tensioned slab after they had cut a void to…
The Cleveland Bay Purification Plant treats a large portion of Townsville’s wastewater, which needs to meet a suitable standard before…
Lake Julius was formed following the construction of Julius Dam in 1976 for irrigation and town water storage. The dam…
While heritage restoration is a challenging sector, NCS has demonstrated their expertise and capabilities in assisting in the transformation of…
National Concrete Solutions were engaged to extend the service life of 32 existing structural piles and headstock that were to…
NCS was engaged to rehabilitate the concrete surfaces of the flocculation chamber at North Pine Water Treatment Plant, as part…
NCS were engaged to undertake a hydro demolition of spalling locations in the Loganholme Wastewater Treatment Plant. These works were…
Lake Manchester is located west of Brisbane and was constructed in 1916, making it one of the region’s first dams.…
NCS embarked on this joint venture to offer their remediation services on a newly built train station walls. During construction,…
NCS was engaged to rehabilitate Clarifier 2 at Mudgeeraba Water Treatment Plant, on the Gold Coast. The Mudgeeraba WTP, is…
South East Queensland has many aging water infrastructure assets requiring remedial works to keep fresh water supplies up to speed…
NCS were approached to assess and remediate spalling repairs necessary to the dam spillway. Although safety is always a priority…
The Sherrin Stand had experienced deterioration and water had entered into spaces beneath the grandstand which caused extensive water damage…
In the regional city of Orange, recent works were undertaken by the NCS team at the Charles Sturt University Campus’…
NCS were awarded the contract to rehabilitate the 66m high concrete boiler stack at the Victoria Mill. Acting as principle…
NCS was contracted directly by the asset owner, Goulburn Murray Water to carry out remedial repairs on Snipey Road Bridge.…
NCS were engaged by the Asset Owner, Murray Irrigation to supply solutions and services for bridge and culvert remediation and…
Since construction, the lowest 4 construction joints in the inlet tower of Corin Dam had been leaking causing deterioration to…