The Sherrin Stand had experienced deterioration and water had entered into spaces beneath the grandstand which caused extensive water damage to the concrete. NCS were required to provide an end solution in the remediation and waterproofing of this heritage AFL stand.
By implementing a systematic process in the remediation of cracks, cold joint repairs and overall use of repair mortars, National Concrete Solutions were able to provide a watertight structure for the further redevelopment of the stand with an extended service life.