On Site: Surface preparation underway with the Victorian NCS team undertaking specialised concrete works as part of a major upgrade package. The works include the installation of a hybrid corrosion protection system with reinforced concrete CR patch repairs during the limited shutdown time period, in an effort to repair existing deterioration of the reinforced concrete wall sections of Melbourne Water Whaler's Cove West waterway and provide protection for a design life of 20 years.