North Pine Water Treatment Plant - Queensland

NCS was engaged to rehabilitate the concrete surfaces of the flocculation chamber at North Pine Water Treatment Plant, as part of a much needed upgrade by SEQ Water. The concrete had lost approximately 10mm of fines, exposing the aggregate, and thus leaving the concrete vulnerable to further deterioration.

To fully understand the extent of deterioration, NCS used high pressure water to remove all laitance and material to leave a sound finish. Approximately 1200sqm of concrete surface was rehabilitated and re-instated to its’ original profile, providing not only re-assurance to the  Asset Owner that the steel reinforcement within the structure is protected, but also combining a surface that reduces ongoing maintenance and ultimately offering cost savings.

Capabilities